|Bathroom Reno Reveal|

Posted on Updated on

Ya’ll… The guest bathroom is done(~ish)! Done enough to post! [We lack painting the open shelving] It has been long over due, and I am so glad that it is functioning. Three people and one bathroom under one roof just doesn’t cut it for me. Especially with me being the only girl in the house! [I need my space.]

First off, please keep in mind that we gutted this bathroom [top to bottom], which is why it took fooooorrrreeevvver! So worth it in the end.


During Demo: What a mess!

Replacing and installing insulation in the subfloor.

Floor ductwork and platform built for AC unit.

Moving light fixtures and putting up headboard ceiling.

Shiplap everywhere! 🙂

Floor leveler down and sanded. Flooring installed.

Cement board for tiled shower installed & remaining shiplap installed.

Tile Installation, Grouting and Sealing.

Finishing Touches.

 

And Voila! We have a functioning bathroom! :]

Until the next renovation,
We Are The Marshall’s

 

3 thoughts on “|Bathroom Reno Reveal|

    Sammy and Sufi said:
    April 28, 2017 at 7:31 am

    We are in the middle of our bathroom renovation, this gives me so much hope to see.
    Great progress, did you guys seal the wood there or was it treated so it’s fine? I love wood but I am always unsure how to incorporate it.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s